What was found
DURING SCHEDULED D-CHECK, FOUND RIGHT CREASE BEAM WEB AT BS 467, STRINGER 17R, CORRODED. REMOVED AND REPLACED CREASE BEAM WEB SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND RIGHT CREASE BEAM WEB AT BS 467, STRINGER 17R, CORRODED. REMOVED AND REPLACED CREASE BEAM WEB SECTION PER SRM.