What was found
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED AT BS 344, LBL 21 TO RBL 1. REPAIRED FLOOR BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED AT BS 344, LBL 21 TO RBL 1. REPAIRED FLOOR BEAM PER SRM.