What was found
DURING SCHEDULED 1/2D CHECK, FOUND RT CREASE BEAM AT BS 727B +2 TO BS 727B + 12, CORRODED. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND RT CREASE BEAM AT BS 727B +2 TO BS 727B + 12, CORRODED. REPAIRED CREASE BEAM PER SRM.