What was found
DURING SCHEDULED 1/2D CHECK, FOUND CABIN FLOORBEAMS CORRODED AT BS 344, LBL 9, BS 967, RBL 5, AND BS 986-987, LBL 26 TO LBL 35. REPAIRED FLOORBEAMS PER SRM AND ERO.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CABIN FLOORBEAMS CORRODED AT BS 344, LBL 9, BS 967, RBL 5, AND BS 986-987, LBL 26 TO LBL 35. REPAIRED FLOORBEAMS PER SRM AND ERO.