What was found
DURING SCHEDULED 1/2D CHECK, FOUND RT CREASE BEAM AT BS 967 TO BS 983, CORRODED. REMOVED AND REPLACED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND RT CREASE BEAM AT BS 967 TO BS 983, CORRODED. REMOVED AND REPLACED CREASE BEAM PER SRM.