What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE BUTTSTRAP AT BS 908, STRINGER 14L, CRACKED. REPAIRED BUTTSTRAP PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE BUTTSTRAP AT BS 908, STRINGER 14L, CRACKED. REPAIRED BUTTSTRAP PER SRM.