What was found
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE AT BS 500C, BETWEEN STR 26L TO STR 28L, CORRODED. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE AT BS 500C, BETWEEN STR 26L TO STR 28L, CORRODED. REPAIRED SHEAR TIE PER SRM.