What was found
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE AT BS 1006, LBL 4 TO RBL 4, CORRODED. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE AT BS 1006, LBL 4 TO RBL 4, CORRODED. REMOVED AND REPLACED SHEAR TIE PER SRM.