What was found
DURING SCHEDULED D-CHECK, FOUND VERTICAL STAB RT T/E BEAM AT STATION 79, CRACKED. REMOVED AND REPLACED BEAM SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND VERTICAL STAB RT T/E BEAM AT STATION 79, CRACKED. REMOVED AND REPLACED BEAM SECTION PER SRM.