What was found
DURING SCHEDULED D-CHECK, FOUND 2 EACH FRAMES CRACKED AT BS 787, STRINGER 9R AND BS 827, STRINGER 9. REPAIRED FRAME SECTIONS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 EACH FRAMES CRACKED AT BS 787, STRINGER 9R AND BS 827, STRINGER 9. REPAIRED FRAME SECTIONS PER SRM.