What was found
DURING SCHEDULED 1/4D CHECK, FOUND AFT CARGO COMPT FRAME SHEAR TIE CORRODED AT BS 747, RBL 7 TO RBL 13. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND AFT CARGO COMPT FRAME SHEAR TIE CORRODED AT BS 747, RBL 7 TO RBL 13. REPAIRED SHEAR TIE PER SRM.