What was found
DURING SCHEDULED D-CHECK, FOUND 2 EACH FLOORBEAMS CRACKED AND CORRODED BETWEEN BS 947 AND BS 986, LBL 53 AND RBL 48. REMOVED AND REPLACED FLOORBEAM SECTIONS PER ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 EACH FLOORBEAMS CRACKED AND CORRODED BETWEEN BS 947 AND BS 986, LBL 53 AND RBL 48. REMOVED AND REPLACED FLOORBEAM SECTIONS PER ER.