What was found
DURING SCHEDULED D-CHECK, FOUND 4 EACH SHEAR TIES BETWEEN BS 727D AND BS 787, FROM LBL 11 TO RBL 14, CORRODED. REMOVED AND REPLACED SHEAR TIES PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 4 EACH SHEAR TIES BETWEEN BS 727D AND BS 787, FROM LBL 11 TO RBL 14, CORRODED. REMOVED AND REPLACED SHEAR TIES PER SRM.