What was found
DURING SCHEDULED D-CHECK, FOUND FRAME AT BS 500B, BETWEEN STRINGERS 27L AND 28R, CORRODED. REMOVED AND REPLACED FRAME SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FRAME AT BS 500B, BETWEEN STRINGERS 27L AND 28R, CORRODED. REMOVED AND REPLACED FRAME SECTION PER SRM.