What was found
DURING SCHEDULED D-CHECK, FOUND 2 EACH LONGITUDINAL BEAMS FROM BS 540 TO BS 727, BETWEEN BS RBL 24 TO RBL 45, CORRODED. REPAIRED LONGITUDINAL BEAMS PER ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 EACH LONGITUDINAL BEAMS FROM BS 540 TO BS 727, BETWEEN BS RBL 24 TO RBL 45, CORRODED. REPAIRED LONGITUDINAL BEAMS PER ER.