What was found
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON CREASE BEAM Z-ANGLE, RT SIDE, BETWEEN BS 927 AND BS 1006. REMOVED AND REPLACED RT CREASE BEAM Z-ANGLE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON CREASE BEAM Z-ANGLE, RT SIDE, BETWEEN BS 927 AND BS 1006. REMOVED AND REPLACED RT CREASE BEAM Z-ANGLE PER SRM.