What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACK AT BS 380, STR 9R. REPAIRED FUSELAGE FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACK AT BS 380, STR 9R. REPAIRED FUSELAGE FRAME PER SRM.