What was found
DURING SCHEDULED D-CHECK, FOUND L1 DOOR CREASE BEAM WEB CORRODED BETWEEN BS 312 TO BS 344, LBL 63, WL 208. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND L1 DOOR CREASE BEAM WEB CORRODED BETWEEN BS 312 TO BS 344, LBL 63, WL 208. REPAIRED CREASE BEAM PER SRM.