What was found
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON SHEAR TIE AT BS 747, BETWEEN RBL 7 TO RBL 11. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON SHEAR TIE AT BS 747, BETWEEN RBL 7 TO RBL 11. REPAIRED SHEAR TIE PER SRM.