What was found
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON SHEAR TIE AT BS 747, BETWEEN STR 27L TO STR 27R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON SHEAR TIE AT BS 747, BETWEEN STR 27L TO STR 27R. REPAIRED SHEAR TIE PER SRM.