What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 360, BETWEEN STR 27L TO STR 27R. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 360, BETWEEN STR 27L TO STR 27R. REPAIRED FRAME PER SRM.