What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 500D, STR 16L. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 500D, STR 16L. REMOVED AND REPLACED SHEAR TIE PER SRM.