What was found
DURING SCHEDULED D-CHECK, FOUND 2 EA FUSELAGE FRAME CRACKS AT BS 400, STR 8L TO STR 9L & STR 15R TO STR 16R. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 EA FUSELAGE FRAME CRACKS AT BS 400, STR 8L TO STR 9L & STR 15R TO STR 16R. REPAIRED FRAME PER SRM.