What was found
DURING SCHEDULED D-CHECK, FOUND 4 EA FUSELAGE SHEAR TIES CRACKED AT BS 400, BS 500A, BS 500B & BS 520, STR 15R TO STR 16R. REPAIRED SHEAR TIES PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 4 EA FUSELAGE SHEAR TIES CRACKED AT BS 400, BS 500A, BS 500B & BS 520, STR 15R TO STR 16R. REPAIRED SHEAR TIES PER SRM.