What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 787, LBL 10 TO RBL 22. REMOVED AND REPLACED SHEAR TIE SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 787, LBL 10 TO RBL 22. REMOVED AND REPLACED SHEAR TIE SECTION PER SRM.