What was found
DURING SCHEDULED D-CHECK, FOUND LONGITUDINAL FLOORBEAM CORRODED AT BS 986, RBL 45. REPAIRED FLOORBEAM PER BFG ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND LONGITUDINAL FLOORBEAM CORRODED AT BS 986, RBL 45. REPAIRED FLOORBEAM PER BFG ER.