What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 767, RBL 7 TO RBL 10. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 767, RBL 7 TO RBL 10. REMOVED AND REPLACED SHEAR TIE PER SRM.