What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE SHEAR TIES CORRODED AT BS 807, RBL 3, LBL 3 & LBL 9. REMOVED AND REPLACED SHEAR TIES PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE SHEAR TIES CORRODED AT BS 807, RBL 3, LBL 3 & LBL 9. REMOVED AND REPLACED SHEAR TIES PER SRM.