What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FLOORBEAM TEE CORRODED AT BS 270, LBL 11 TO RBL 11. REMOVED AND REPLACED FLOORBEAM T-CHORD PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FLOORBEAM TEE CORRODED AT BS 270, LBL 11 TO RBL 11. REMOVED AND REPLACED FLOORBEAM T-CHORD PER SRM.