What was found
DURING SCHEDULED 5Y CHECK, FOUND LONGITUDINAL FLOOR SUPPORT CORRODED BETWEEN BS 771 TO BS 773, RBL 8. REPAIRED FLOOR SUPPORT PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 5Y CHECK, FOUND LONGITUDINAL FLOOR SUPPORT CORRODED BETWEEN BS 771 TO BS 773, RBL 8. REPAIRED FLOOR SUPPORT PER SWA EA.