What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 847, RBL 21. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 847, RBL 21. REPAIRED FRAME PER SRM.