What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 907, BETWEEN STR 19L TO STR 20L. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 907, BETWEEN STR 19L TO STR 20L. REPAIRED SHEAR TIE PER SRM.