What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 360, BETWEEN STR 15R AND STR 16R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE FRAME SHEAR TIE CRACKED AT BS 360, BETWEEN STR 15R AND STR 16R. REPAIRED SHEAR TIE PER SRM.