What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE BS 178 BULKHEAD VERTICAL STRAP CRACKED AT BL 0, WL 188. REPAIRED STRAP PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE BS 178 BULKHEAD VERTICAL STRAP CRACKED AT BL 0, WL 188. REPAIRED STRAP PER SWA EA.