What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED BETWEEN BS 927 TO BS 947.5, RBL 13.8. REPAIRED SHEAR TIE PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED BETWEEN BS 927 TO BS 947.5, RBL 13.8. REPAIRED SHEAR TIE PER SWA EA.