What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE STRINGER SPLICE CORRODED AT BS 907, STR 25R. R & R SPLICE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE STRINGER SPLICE CORRODED AT BS 907, STR 25R. R & R SPLICE PER SRM.