What was found
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE STRINGER CORRODED BETWEEN BS 867 TO BS 887, STR 26R. REPAIRED STRINGER PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE STRINGER CORRODED BETWEEN BS 867 TO BS 887, STR 26R. REPAIRED STRINGER PER SRM.