What was found
DURING SCHEDULED 10Y CHECK, FOUND FUSELAGE CREASE BEAM CORRODED AT BS 390, RT SIDE. REPAIRED CREASE BEAM SECTION PRE SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 10Y CHECK, FOUND FUSELAGE CREASE BEAM CORRODED AT BS 390, RT SIDE. REPAIRED CREASE BEAM SECTION PRE SRM.