What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 360, BETWEEN STR 13L TO STR 14L. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 360, BETWEEN STR 13L TO STR 14L. REMOVED AND REPLACED SHEAR TIE PER SRM.