What was found
DURING SCHEDULED 10Y CHECK, FOUND FUSELAGE VERTICAL BEAM WEB CORRODED AT BS 795, RBL 20, WL 157. REMOVED AND REPLACED VERTICAL BEAM WEB SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 10Y CHECK, FOUND FUSELAGE VERTICAL BEAM WEB CORRODED AT BS 795, RBL 20, WL 157. REMOVED AND REPLACED VERTICAL BEAM WEB SECTION PER SRM.