What was found
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR UPPER FRAME CRACKED. REMOVED AND REPLACED AFT CARGO DOOR UPPER FRAME SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR UPPER FRAME CRACKED. REMOVED AND REPLACED AFT CARGO DOOR UPPER FRAME SECTION PER SRM.