What was found
DURING SCHEDULED 1/4D CHECK, FOUND SHEAR TIE CORRODED AT BS 500C, RBL 4 TO LBL 4. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND SHEAR TIE CORRODED AT BS 500C, RBL 4 TO LBL 4. REMOVED AND REPLACED SHEAR TIE PER SRM.