What was found
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT, FWD FRAME CRACKED AT NR 5 DOOR STOP. REMOVED AND REPLACED FWD FRAME SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT, FWD FRAME CRACKED AT NR 5 DOOR STOP. REMOVED AND REPLACED FWD FRAME SECTION PER SRM.