What was found
DURING SCHEDULED 20Y CHECK, FOUND PRESSURE DOME WEB CRACKED AT BS 1016, THIRD FASTENER FROM DOME CAP. REPAIRED WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 20Y CHECK, FOUND PRESSURE DOME WEB CRACKED AT BS 1016, THIRD FASTENER FROM DOME CAP. REPAIRED WEB PER SRM.