What was found
DURING SCHEDULED 20Y CHECK, FOUND FUSELAGE STRUCTURE CORRODED AT BS 727, LBL 4 TO LBL 6. REMOVED AND REPLACED STRUCTURE SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 20Y CHECK, FOUND FUSELAGE STRUCTURE CORRODED AT BS 727, LBL 4 TO LBL 6. REMOVED AND REPLACED STRUCTURE SECTION PER SRM.