What was found
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT FWD FRAME CRACKED AT STR 24R. REMOVED AND REPLACED FRAME SECTION PER ACO.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND AFT CARGO DOOR CUTOUT FWD FRAME CRACKED AT STR 24R. REMOVED AND REPLACED FRAME SECTION PER ACO.