What was found
DURING SCHEDULED SERVICE CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 400, STR 8R. REPAIRED FRAME SECTION PER ER AND SB.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SERVICE CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 400, STR 8R. REPAIRED FRAME SECTION PER ER AND SB.