What was found
DURING SCHEDULED 18Y CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 510, LBL 68. REMOVED AND REPLACED CREASE BEAM WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 18Y CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 510, LBL 68. REMOVED AND REPLACED CREASE BEAM WEB PER SRM.