What was found
DURING SCHEDULED 22Y CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 807 TO BS 827, RBL 70. REMOVED AND REPLACED CREASE BEAM WEB PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND CREASE BEAM WEB CORRODED AT BS 807 TO BS 827, RBL 70. REMOVED AND REPLACED CREASE BEAM WEB PER SRM.