What was found
DURING SCHEDULED 10Y CHECK, FOUND RIGHT MLG STABILIZER BEAM CORRODED. REMOVED AND REPLACED MLG BEAM PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 10Y CHECK, FOUND RIGHT MLG STABILIZER BEAM CORRODED. REMOVED AND REPLACED MLG BEAM PER MM.